EC Cleaners Network · From Requirement to Evidence
Facilities management · TR19® Grease · Multi-site estates
TR19 Kitchen Extraction for Facilities Management Providers
Managing kitchen extraction across several client sites is less about collecting certificates and more about knowing what has actually been instructed, completed, excluded and left outstanding.
Facilities-management teams can inherit restaurants, staff kitchens, schools, care premises, leisure facilities and other catering environments with different extraction systems, contractors, maintenance histories and access constraints. A consistent commercial framework makes those differences easier to manage without pretending every kitchen or every client has the same technical requirement.
Consistency does not mean forcing every site into the same scope. It means asking the same core questions about the asset, trigger, access, contractor and close-out evidence at every location.

Why FM portfolios become difficult
One estate can contain dozens of different versions of the same apparent maintenance problem.
The contract manager needs enough information to see which locations are genuinely closed out, which are awaiting documents and which contain a physical problem that another contractor visit will not solve by itself.
Historic records are inconsistent
One site has photographs and a detailed system report, another has a one-page certificate, and another has no useful record of the previous extraction clean.
Contractors price different system boundaries
One quotation may include the canopy, ductwork and fan while another assumes that high-level plant, risers or inaccessible sections are outside scope.
Access defects keep recurring
A missing panel or inaccessible riser can appear on successive contractor reports unless it becomes its own tracked remedial action.
The estate dashboard says “complete” too early
A contractor attendance does not necessarily mean the whole instructed system was completed or that all required evidence has returned.

One estate · several workstreams
Keep the maintenance frameworks separate enough to remain useful.
An FM contract can contain grease extraction, general ventilation, planned maintenance, access remediation and technical engineering requirements at the same premises. They can sit within one estate-management system without being described as the same service.
TR19® Grease
Relevant where the requirement concerns grease accumulation and associated fire-risk management within commercial kitchen extraction.
TR19® Air
The separate BESA specification for internal cleanliness and hygiene management of general ventilation systems, distinct from grease-laden kitchen extract.
SFG20
Can support asset-based planned maintenance by structuring tasks, criticality, frequency and required skill sets within the organisation’s maintenance regime.
DW/172
Relevant to commercial kitchen ventilation design, installation and maintainability rather than functioning as a contractor cleaning certificate.
Access & remediation
Missing access panels, roof restrictions and inaccessible duct sections should become separately controlled actions where they prevent the intended work.
Contractor assurance
Legal identity, work type, relevant competence, insurance, access capability, proposed scope and reporting should be checked against the individual requirement.
Portfolio control
Start with a site-and-system register rather than a folder of certificates.
A useful estate view identifies the individual premises, relevant extraction system, reason action is required, latest usable evidence, access status and next decision. That gives the FM team something it can actually manage.
Site & system
Premises, kitchen or catering area and the individual extraction system being tracked.
Trigger
Planned maintenance, previous report, fire risk, insurer request, refurbishment, acquisition or another requirement.
Evidence status
Report, photographs, certificate, quotation or other useful documentation currently held.
Access status
Known access panels, roof arrangements, inaccessible sections and enabling work still required.
A more useful estate status
Replace a simple green tick with statuses that tell the contract manager what happens next.
The exact terminology can be adapted to the customer’s CAFM or compliance platform, but the important principle is to distinguish physical completion from documentary or remedial actions that remain open.
Status 01
Completed & evidenced
The instructed physical scope has been reported as completed and the expected close-out documentation has returned.
Status 02
Completed · evidence awaited
The contractor attendance has finished but the agreed report, photographs, certificate or other completion documentation has not yet been received.
Status 03
Partial / access limitation
Some intended sections could not be reached or another physical constraint prevented complete delivery of the instructed scope.
Status 04
Technical review required
The contractor record has surfaced an issue outside routine cleaning, such as airflow, design, damaged plant, fire-rated ductwork or another technical question.
FM mobilisation
The best time to expose portfolio inconsistencies is before the first programme of works begins.
Inherited maintenance records are rarely as consistent as the new contract specification.
At mobilisation, the FM provider can separate what is known from what still needs confirmation. That creates a clearer baseline for future procurement without retrospectively pretending old certificates prove more than they actually contain.
1 · Build the asset list
Identify relevant kitchens, systems, plant and known system references across the client estate.
2 · Gather existing records
Reports, certificates, photographs, schedules, quotations, risk actions and previous contractor information.
3 · Surface unknowns
Unclear system boundaries, unknown fan locations, repeated exclusions, missing access and absent documents.
4 · Prioritise action
Use the actual maintenance, risk, contractual and client requirements rather than giving every site the same arbitrary priority.
5 · Standardise future close-out
Agree the minimum information expected from contractors across the programme before new work is appointed.
Contractor control
Use a common contractor-assurance structure without assuming one supplier fits every system.
National consistency is valuable, but contractor suitability still depends on the technical work, geography, access method and operating environment at the individual location.
Legal identity
Keep the contracting entity, quotation, insurance, report and invoicing information aligned.
Relevant work type
Separate TR19® Grease, TR19® Air, access/remediation and other specialist activities.
Competence & registration
Where a register or particular technical credential is specified, verify the current position directly rather than relying on an old logo.
Site capability
Consider roof work, MEWP, high-level access, occupied premises, security, permits and shutdown requirements.
Written scope
System boundary, access assumptions, exclusions, programme and evidence should be visible before award.
Evidence control
The evidence should answer the FM team’s original instruction.
A standardised close-out requirement makes estate reporting easier without forcing every contractor report into an artificial identical format.
System identity
The premises, kitchen and extraction or ventilation system should be identifiable.
Work completed
The contractor should make the physical work and relevant system sections understandable.
Photographs & results
Evidence should be attributable to recognisable components and test locations where relevant.
Limitations
Inaccessible, excluded or uncompleted areas should remain explicit.
Next action
Access work, repairs, further cleaning or professional review should be capable of becoming a new controlled task.
FM portfolios
One commercial structure can support very different client estates.
The physical systems and operating pressures change by sector. The FM provider can still use consistent intake, contractor, status and close-out controls across the portfolio.
FM & multi-site requirement
Need to organise extraction requirements across a client estate?
Send the estate size, client sectors, current contractor or reporting position and any immediate problem sites. EC can help organise the commercial information, make scope and evidence questions easier to see and identify potentially appropriate independent specialist capability. Search and Submit Ltd does not technically approve the systems or contractors.
Portfolio
Number of premises, regions, client types and approximate number of relevant kitchen or ventilation systems.
Current position
Existing incumbent, mixed contractor estate, mobilisation, retender, acquisition or problem-site programme.
Existing evidence
Reports, certificates, asset data, schedules, photographs, quotations and outstanding actions already held.
Known access issues
Recurring inaccessible ductwork, roof restrictions, missing panels, high-level plant or other enabling requirements.
Programme
Contract mobilisation dates, maintenance windows, geographic sequencing and client reporting deadlines.
Close-out requirement
The reporting, photographs, certificates, status information and escalation route required across the portfolio.
Network operator
Search and Submit Ltd
Telephone
EC role
Commercial coordination & requirement organisation
UK coverage
Subject to portfolio, scope, geography and independent specialist availability
EC Cleaners Network is operated by Search and Submit Ltd. Search and Submit Ltd does not inspect, clean, test, survey, design, remediate, commission, certify or technically approve commercial kitchen extraction or ventilation systems and does not act as the facilities manager or statutory dutyholder for customer premises.
FM providers, clients, landlords and other organisations retain the duties and contractual responsibilities applicable to their own role and premises. Independent appointed contractors and competent professionals remain responsible for technical assessment, quotations, safe working, physical delivery, measurements, reporting, certification and professional conclusions within their appointed scope.
TR19® Grease and TR19® Air are separate BESA specifications. SFG20 is a building-maintenance specification and maintenance-management framework; it should not be presented as a universal kitchen compliance certificate. References to BESA, SFG20 or contractor registers are descriptive and do not imply endorsement of EC Cleaners Network.