How to Appoint a TR19 Kitchen Extract Contractor

The right contractor is the one that fits the actual job—not simply the one with the right phrase on its website.

Commercial kitchen extract work can involve grease hygiene, high-level access, roof work, restricted working hours, complex duct routes, inaccessible sections and detailed post-clean reporting. A sensible appointment process therefore looks beyond price and asks whether the contractor, technicians, proposed scope and site arrangements all match the requirement.

Commercial kitchen canopy work at Barton Peveril from the historic EC Cleaners archive
Historic EC Cleaners archive · specialist kitchen-extract context

Four separate appointment questions

Do not confuse registration, training and suitability for the specific site.

A contractor can hold relevant industry credentials and still be the wrong fit for a particular project. Equally, an experienced supplier may describe itself as working to TR19® Grease without being a current Vent Hygiene Register member.

The client should therefore separate four checks: who the legal contractor is, whether the people undertaking the work are appropriately competent, whether VHR registration is required and current, and whether the proposed contractor can actually deliver the site’s scope, access and reporting needs.

CompanyWhich legal entity will contract with the client, carry insurance, invoice the work and remain accountable for delivery?
PeopleWhat training, qualifications, experience and supervision support the technicians and managers doing the work?
RegistrationIs current VHR Grease status required by the client, insurer, adviser or procurement specification?
Job fitCan the contractor manage this system, building, access route, working window and evidence requirement?

HSE contractor-selection principles

The client still has a role after deciding to outsource the work.

HSE describes competence as a combination of training, skills, experience and knowledge and the ability to apply them safely. Its contractor guidance says organisations using contractors should select suitable people, exchange relevant information, coordinate the work, manage and supervise the activity and understand where responsibilities sit.

HSE’s current human-factors guidance also says organisations that outsource work should retain an understanding of the service being supplied—often described as maintaining “intelligent customer” capability. In practical terms, the client does not need to become a kitchen-extract cleaner, but it should know enough to ask sensible questions and recognise when a quotation or outcome does not answer the original requirement.

Appointment is not abdication.

The specialist contractor owns the technical work within its scope. The client or FM team still needs to provide site information, coordinate interfaces and check that the returned outcome answers what was actually commissioned.

Vent Hygiene Register

If you specify VHR, verify the current contractor and the correct category.

BESA describes the Vent Hygiene Register as the UK’s official register for ventilation-hygiene contractors. Its current scheme has separate Grease and Air categories. For commercial kitchen extraction, the relevant category is VHR Grease.

BESA says VHR members undergo a robust audit process covering commercial and technical capability. Its current application requirements include company financial and management information, insurance, health-and-safety arrangements, technician qualifications, an on-site technical audit and independent review of the first five post-clean reports during onboarding.

To self-certify VHR work, BESA currently states a minimum qualification of Grease Hygiene Technician for TR19® Grease activity and Air Hygiene Technician for TR19® Air activity. These scheme requirements are useful assurance checks, but the client should still compare the contractor with the actual job.

Current statusUse the live VHR contractor search rather than relying on an old certificate, logo or historical membership claim.
Correct categoryVHR Grease is the relevant category for kitchen grease extract; VHR Air covers general ventilation.
Technician qualificationCheck that the people responsible for notified/self-certified work meet the applicable current VHR requirements.
Audit trailVHR’s scheme includes technical audit and review of post-clean reporting as part of its assurance model.

Check the company before the quotation

Know exactly who you are appointing.

Legal identity

Confirm the business name and legal entity shown on the quotation, purchase order, insurance documents and eventual invoice. Where a group uses trading names or subcontractors, establish who is contractually responsible for the work.

Insurance

Check the contractor carries the insurance required by the client and appropriate to the planned work. BESA’s current VHR application requirements include evidence of public liability insurance and employers’ liability insurance where applicable.

Health & safety arrangements

For work involving roofs, high-level plant, chemicals, access equipment or other hazards, ask how the contractor plans and manages the work. RAMS should reflect the actual site rather than being treated as a generic document supplied after appointment.

Subcontracting

Establish whether the company quoting will carry out the work itself and, if not, how subcontractor competence, insurance, supervision and reporting will be controlled.

Operative & technician competence

A company credential does not tell you everything about the people attending the site.

BESA Academy currently offers separate Grease Hygiene Operative and Grease Hygiene Technician courses aligned with TR19® Grease and National Occupational Standards. Its technician-level course covers areas including risk assessments and method statements, pre- and post-clean testing/reporting and installation of access panels to industry standards.

That distinction matters because a site may need more than physical cleaning. Complex systems, testing, technical reporting, access-panel decisions or supervisory responsibilities may need a suitably experienced technician rather than simply a cleaning operative.

OperativeWho will carry out the physical cleaning and what relevant training and experience do they have?
TechnicianWho is responsible for technical supervision, testing, reporting and decisions within the contractor’s scope?
Site experienceHas the team worked in comparable premises such as hospitals, food factories, heritage assets, shopping centres or live hospitality sites?
Access competenceDoes the planned work involve MEWPs, roof access, confined areas or other specialist access that requires additional competence?

Historic technical context

Contractor capability has to follow the real system.

The historic EC Cleaners archive includes kitchen-extract work at education, care and hospitality sites. The images show why a contractor appointment should consider the actual equipment and access conditions rather than assuming all kitchen-extract projects are operationally identical.

These photographs are historic EC project context only. They are not current Search and Submit Ltd contractor assessments or endorsements of any current supplier.

Commercial kitchen extraction hood at Park Manor from the historic EC Cleaners archive
Historic archive · system-specific work
Commercial kitchen extraction fan in Brighton from the historic EC Cleaners archive
Historic archive · downstream fan context

Scope before price

A cheaper quotation may simply contain less work.

Contractor comparison is only meaningful when suppliers are pricing the same intended system. One quotation may include canopy, horizontal duct, riser, fan and discharge; another may price only accessible sections or assume that roof access and access panels are outside scope.

Before comparing totals, identify what each supplier has included, excluded or assumed. The commercial objective is not to force identical prices—it is to understand whether the quotations answer the same requirement.

Kitchen Extract System Scope Guidance →

SystemWhich canopy, duct route, riser, fan and discharge are included?
AccessWhat access panels, roof arrangements, ladders, MEWPs or landlord permissions are assumed?
TestingWhat pre/post-clean inspection or measurement is included within the contractor’s technical method?
ReportingWhat report, photographs, results, certificate or applicable VHR record will be returned?
ExclusionsWhat work will not be undertaken and what happens if the contractor discovers another inaccessible area?

Site suitability

The right national contractor can still fail if the site has not been mobilised properly.

The client should provide relevant information about the workplace, hazards, access and operational restrictions. HSE’s contractor guidance stresses information exchange and coordination before work starts.

Kitchen-extract projects can fail for entirely preventable reasons: no roof key, no permit, a wedding in the function room, a production line that cannot stop, a landlord-controlled riser, no safe route for access equipment or another contractor occupying the same work area.

Working windowConfirm actual shutdown and restart times rather than assuming “overnight” means unrestricted access.
Security & inductionSite rules, escorts, keys, alarms, permits and signing-in arrangements.
Roof / plant accessWho controls it, what safety arrangements apply and whether specialist equipment is needed.
Other tradesCoordinate cleaning, electrical isolation, fire-stopping, duct alterations or access work where several contractors are involved.
Decision-makerNominate someone who can respond if the specialist discovers an unexpected condition during the working window.

Reading VHR status correctly

“Awaiting approval”, “suspended” and “expired” do not mean “approved”.

BESA’s live VHR search currently distinguishes several contractor statuses. “Approved” means the contractor is a VHR member and can demonstrate compliance with the relevant requirements. Other statuses include awaiting approval, suspended, membership expired, voluntary withdrawal and removed from the register.

BESA’s current specifier guidance recommends checking the live register and selecting a currently approved contractor where VHR is being specified. This is materially stronger than relying on a logo copied onto a proposal or website.

Verify at the point of appointment.

Registration can change. Keep the live contractor check or relevant procurement record with the appointment documentation where VHR status is important to the client or adviser.

Questions before award

A good quotation should reduce uncertainty before the contractor reaches site.

Not every project needs a long tender questionnaire. The depth of due diligence should be proportionate to the work and risk. For a straightforward restaurant system, a concise set of checks may be enough; a hospital, food factory, heritage property or complex multi-site estate may justify more detailed assurance.

Who is contracting?Legal company, trading name and any subcontractor involved.
What is included?System scope, access, testing, cleaning and reporting.
Who attends?Operatives, supervising technician and specialist access personnel where relevant.
What credentials apply?Current VHR category where specified, relevant training and insurance.
What could stop completion?Known access, isolation, roof, landlord, building or operational constraints.
What comes back?Post-clean report, photographs, results, certificate/notification and explicit exclusions.

After the work

Contractor assurance continues into close-out.

The appointment should define the evidence expected at completion so that the facilities team is not left negotiating for a report after the invoice arrives. Returned documentation should identify what was completed and keep any inaccessible or outstanding item explicit.

Where the work originated from an insurer, fire-risk assessor or consultant recommendation, the resulting evidence can be returned to that professional for review within their own appointment.

Post-Clean Evidence Guidance →

Report receivedDoes it identify the correct site, system, date and contractor?
Evidence presentAre photographs, results and certificates/notifications present where expected?
Exclusions visibleDid any part of the intended system remain inaccessible or outside scope?
Further actions ownedWho will deal with access remediation, another technical finding or professional review?

EC Contractor Assurance

EC can structure the appointment checks without claiming to accredit the contractor.

EC Cleaners Network can organise customer-supplied contractor information, help verify publicly available VHR status, compare quotations against the intended commercial scope, identify obvious missing information and coordinate introductions to potentially appropriate independent specialists.

EC does not certify contractor competence, approve RAMS, guarantee performance, carry out VHR audits, validate insurance cover or supervise the contractor’s technical work. BESA, the contractor, insurer and relevant competent professionals retain their own roles.

Contractor Assurance Service →

EC can checkCommercial identity, publicly available registration status and supplied documents.
EC can compareQuotation scope, assumptions, exclusions and promised evidence.
EC can coordinatePotentially appropriate independent contractor capability and site information.
EC cannot accreditTechnical competence, VHR compliance, workmanship, safe systems or final technical outcome.

Need to appoint a kitchen-extract specialist?

Send the system information before asking contractors to compete on price.

Include the site, kitchen, previous reports, access information, original fire-risk or insurer action and any contractor requirements already specified. EC can help structure the commercial brief and identify the checks that should be resolved before award.

EC Cleaners Network is operated by Search and Submit Ltd. This guidance provides general commercial and procurement information only and is not health-and-safety, legal, insurance, engineering or technical advice. Search and Submit Ltd does not accredit contractors, certify competence, audit VHR compliance, approve RAMS, validate insurance cover, supervise specialist work, inspect systems or guarantee contractor performance. Clients remain responsible for their own procurement and statutory duties, while independent appointed contractors and relevant competent professionals remain responsible for technical assessment, safe working, physical delivery, reporting and certification within their own scope.